Skip Ribbon Commands
Skip to main content
None

Squirrely Building Damage Claim

A squirrel entered a community center building that had just undergone a $2 million renovation. It either gnawed some wiring or otherwise came in contact with the electrical system, causing a major power surge. Three newly installed HVAC systems were severely damaged, along with parts of the boiler system. Estimated damage was $300,000. Is this covered by the ISO CP 10 30 Special Causes of Loss form? What about ISO’s HO-3 policy?

Big ‘I” members must be logged in to view all the content on this page.
 

image 
 
​127 South Peyton Street
Alexandria VA 22314
​phone: 800.221.7917
fax: 703.683.7556
email: info@iiaba.net

Follow Us!


​Empowering Trusted Choice®
Independent Insurance Agents.